📞 24/7 Emergency Call Line: (385) 247-9359
Updated Oct 2026

Our warranty at a glance

2 years
Workmanship (was 1 yr)
90 days
Mold remediation
Transferable
Once, within coverage

Warranty call goes to Michael Bass personally. (385) 247-9359.

A
BBB Profile
BBB Business ProfileTrue Day Water Damage Restoration has a public business profile with the Better Business Bureau, where you can read any complaints and how they were handled. A public record of any complaints filed with the BBB and how they were handled.
Verify on BBB →
5.0
★★★★★
5.0 stars from 41 verified Google reviews.Rating counted at True Day on Google Maps. Updated as it changes.
Verify on Google →

Attic Leak Damage in South Jordan, UT

Attic leaks in South Jordan homes follow a predictable seasonal pattern — one tied to the Wasatch Front’s January and February freeze-thaw cycling more reliably than to any specific construction quality issue. The conditions that produce ice dam formation recur every year with enough consistency that attic moisture damage from this source is not a rare event. It is a routine one that homeowners discover weeks or months after it began, typically when a ceiling stain appears on the drywall below or when they enter the attic for the first time in a year and find significant mold on the decking.

Attic damage has a timing problem that makes it harder to respond to than almost any other water event. The ice dam forms in January. The meltwater enters the attic in January or February. But the ceiling stain that tells the homeowner something happened may not appear until March — weeks after the event, when the slow migration of water through insulation and drywall finally reaches the paint surface. By then the homeowner is not sure when it happened or whether it is still happening. And the attic itself — which would answer both questions in thirty seconds with a flashlight — is the room in the house that nobody opens between Thanksgiving decorations and the Fourth of July. We have found attic assemblies in South Jordan with two and three seasons of accumulated Cladosporium growth on the decking — growth that was adding to itself each winter — that the homeowner discovered only when they went up to retrieve something stored there. The ice dam had done its work quietly for years.

True Day Water Damage Restoration is a licensed Utah Contractor (#960332-3505) and IICRC-Certified Firm (ID #927354-5258). Call us at (385) 247-9359.


Ice Dam Formation — The Mechanism

Ice dams form when heat loss through an inadequately insulated attic floor warms the roof deck — melting overlying snow from below. The meltwater flows down the roof slope toward the eave, where the roof deck temperature is colder because no heat escapes from the unconditioned attic space beyond the exterior wall plane. The meltwater refreezes at the cold eave, accumulating as an ice dam. Subsequent meltwater backs up behind the dam, pooling on the roof surface above it. When the pooled water depth exceeds the height of the ice dam, or when it finds a pathway under the roofing membrane at a nail, seam, or damaged section, it flows under the membrane and into the attic assembly.

This is a thermodynamics problem — not a roofing quality problem and not a weather severity problem. The ice dam forms because the attic is too warm, which is a function of attic insulation adequacy and air sealing of ceiling penetrations. A well-insulated, air-sealed attic maintains a cold roof deck throughout the winter, produces no meltwater above the eave, and does not form ice dams regardless of snowfall. The current International Energy Conservation Code recommendation for this climate zone is R-49 attic floor insulation — a threshold many South Jordan homes built before 2010 do not meet.


What Ice Dam Intrusion Does to Attic Assemblies

Water entering the attic from ice dam intrusion saturates the oriented strand board roof sheathing — the engineered wood panel product used as roof decking in the majority of South Jordan’s residential construction. OSB absorbs moisture readily through its resin-bonded wood fiber composite and does not dry effectively as long as it remains covered by roofing materials and insulation that restrict airflow across its surfaces. Repeated saturation over multiple winter seasons — each ice dam event wetting the sheathing before it fully dried from the previous event — creates the sustained wet cellulose conditions that Cladosporium colonizes on the underside of the decking. Cladosporium on attic sheathing is among the most common mold remediation scenarios we encounter in South Jordan’s established neighborhoods and in the later-phase Daybreak construction with wide-eave hip and gable rooflines.

Attic insulation saturated by ice dam intrusion loses its R-value while wet — further worsening the heat loss through the attic floor that caused the ice dam in the first place. Wet fiberglass batts that partially dry between events retain compressed, clumped fiber that does not recover full performance even after drying.

The water that enters the attic does not stay there. It migrates through the ceiling assembly into the living space below — appearing as ceiling stains, wet drywall, or active drips typically at the eave or at ceiling fixtures near the exterior wall plane. The interior sign appears days to weeks after the ice dam event, because the water moves through insulation and drywall at the slow rate of capillary action and gravity — not at the rate of the original intrusion event.


An Attic Leak Project in an Established South Jordan Neighborhood

In November 2022, we were contacted by a homeowner in an established South Jordan neighborhood near 11200 South — a 2001-era two-story home with a hip roof and wide overhanging eaves, the roofline geometry that was common in production-builder construction of that period and that is particularly prone to ice dam formation because the long eave extension creates a substantial unheated roof surface above the exterior wall plane where refreezing reliably occurs. The homeowner had noticed a brown ceiling stain in the master bedroom — roughly 14 inches in diameter, located approximately two feet from the exterior wall — that had appeared in late March and had not grown since. She had assumed it was from a roof nail pop or a loose shingle and had painted over it. The following November it reappeared, slightly larger, in the same location.

The pattern — a stain that appears in late winter or early spring and reappears the following year in the same location — is the signature of ice dam meltwater intrusion. The stain appears when the water that entered the attic in January finally migrates through the insulation and ceiling assembly to the paint surface in March. It stops growing when the ice dam cycle ends and the attic dries. It reappears the following year because the ice dam forms again in the same location, for the same reason — insufficient attic floor insulation allowing enough heat loss to warm the roof deck and melt the overlying snow.

Our FLIR thermal imaging of the master bedroom ceiling showed a cold zone consistent with residual attic moisture at the stain location and extending 18 inches toward the exterior wall — the path the meltwater had followed through the insulation from the ice dam entry point at the eave. When we accessed the attic, we found Cladosporium colonization on the underside of the oriented strand board sheathing at the eave — covering approximately 22 square feet of decking in a fan pattern radiating from the point where the meltwater had been entering for two seasons. The insulation R-value in the affected area was R-25 — the original 2001 installation — against the current International Energy Conservation Code recommendation of R-49 for this climate zone. The attic had been losing enough heat through this section to reliably melt overlying snow and form an ice dam at the eave every winter.

We remediated the Cladosporium — wire brushing the affected decking, two antimicrobial treatment passes, and a film-forming encapsulant — and coordinated insulation upgrade to R-49 through a licensed insulation contractor before closing the ceiling. The ceiling drywall at the stain location was replaced and repainted. The homeowner’s policy covered the remediation and reconstruction as weather-related roof leak damage. Total approved: $6,340. Deductible: $1,000.

She told us at the final walkthrough that she had been watching that stain for two years, trying to decide whether it was serious enough to call someone. She had Googled “ceiling stain after winter” and found forum posts suggesting it was probably a nail pop or condensation and would dry out on its own. It had not dried out on its own. It had been accumulating Cladosporium on the sheathing above her bedroom every winter, at the slow pace that makes attic damage so easy to rationalize away — not dramatic enough to call someone, not benign enough to forget. That specific kind of low-level worry, sustained over two winters, resolved in a single afternoon when we opened the attic hatch and she saw the thermal imaging results. She knew exactly what she was looking at and exactly what needed to happen. The uncertainty was harder than the answer. The stain on the ceiling was the most visible and least important part of the problem.


Our Attic Leak Damage Response

FLIR thermal imaging of ceiling surfaces from the living space to identify moisture migration pathways before attic access; calibrated moisture metering of all affected sheathing sections and ceiling drywall; removal of saturated insulation; structural drying of the attic assembly with appropriately positioned air movers; Cladosporium remediation of colonized sheathing using wire brushing, antimicrobial treatment, and encapsulant; and coordination of attic insulation replacement and air sealing improvements to reduce the probability of recurrence. We document all findings for the homeowner’s insurance claim — ice dam damage is typically covered under the dwelling coverage of standard HO-3 and HO-5 homeowner policies.


Frequently Asked Questions

How much does attic mold remediation cost after an ice dam in South Jordan?
Typically $3,500 to $8,500 depending on colonized OSB sheathing square footage, insulation replacement scope, and whether ceiling drywall requires replacement. The project documented on this page — 22 square feet of Cladosporium on attic sheathing with ceiling replacement and R-49 insulation upgrade — was approved by Allstate HO-3 at $6,340 after a $1,000 deductible.
Does homeowners insurance cover ice dam damage?
Most HO-3 and HO-5 policies cover ice dam meltwater intrusion as weather-related roof water damage — ceiling stains, attic mold remediation, and drywall replacement are all within the covered scope when documented. The insulation deficiency is not covered. An HO-5 open-perils policy provides broader ice dam coverage than an HO-3.
Why does the ceiling stain appear weeks after the ice dam?
Ice dam meltwater enters the attic at the cold eave and migrates through insulation by capillary action and gravity — slowly, over days to weeks — before saturating the ceiling drywall surface below. January ice dams typically produce ceiling stains in late February or March, in locations near the exterior wall rather than at the roof peak.
Will the stain dry on its own without treatment?
The surface stain may appear to resolve in spring. The Cladosporium colonization on the OSB sheathing above it does not — it remains dormant through summer and reactivates when the following winter’s ice dam introduces moisture to the same sheathing section. A stain that disappears in spring and reappears the following winter in the same location is the diagnostic signature of recurring ice dam meltwater with established attic mold.
What R-value prevents ice dams in South Jordan?
The current IECC recommendation for this climate zone is R-49. South Jordan homes built before 2010 frequently have R-19 to R-30 original insulation — insufficient to prevent the heat loss that warms the roof deck and initiates the snow-melt cycle. Upgrading to R-49 above the affected ceiling section breaks the ice dam formation cycle at that location.
Why require insulation upgrade before closing the ceiling?
Without the upgrade, the same ice dam forms the following January and re-wets the remediated sheathing. Cladosporium re-colonization typically occurs within one to two additional wet cycles. Closing the ceiling over an unaddressed recurrence mechanism means a second mold remediation project within one to two winters.
How is attic mold different from mold in finished spaces?
Attic sheathing mold is invisible from the living space and may develop across 20 to 40 square feet over multiple seasons before any ceiling evidence appears. FLIR thermal imaging from the living space identifies the active moisture cold zone; visual inspection from the attic confirms colonization extent. Remediation proceeds through the attic access — HEPA containment, wire brushing, antimicrobial treatment, encapsulant — without removing the roof structure above.

Learn more: Mold Remediation | Structural Drying | Drywall Repair | Insurance Claims

True Day Water Damage Restoration | 11268 S 2865 W, South Jordan, UT 84095 | (385) 247-9359 | License: #960332-3505 | IICRC: #927354-5258

Financing Available

Pay Over Time Through Wisetack — No Hit to Your Credit to Check

Insurance covers most restoration jobs. For the deductible, non-covered scope, or jobs filed out-of-pocket, True Day offers financing through Wisetack — a homeowner-friendly lender with soft-credit prequalification (checking your rate does not affect your credit score).

$500 – $25,000
Amount financed per job
3 – 24 months
Term options
Soft check
Prequalify without a credit hit

Your True Day project manager can prequalify you in a few minutes during the written-scope visit. Nothing to sign on the spot.

About Wisetack: loans are issued through independent lending partners. Rates and approval depend on your credit profile. Prequalification is a soft inquiry; final approval may involve a hard inquiry. True Day does not profit from or receive referral fees for financing.

Water damage restoration cost FAQ

The questions homeowners ask us about pricing, insurance, and payment.

How much does water damage restoration cost?
It depends on category, affected square footage, and whether materials can be dried in place or need controlled demolition. We give every job a free written Xactimate estimate — the same format your insurance carrier uses — before any work begins.
Will my homeowners insurance cover it?
Sudden and accidental water (a burst pipe, a failed appliance line) is typically covered on a standard HO-3 policy. Flood and groundwater are not covered without a separate flood policy. We bill carriers direct on approved claims.
What’s my out-of-pocket on a covered claim?
Your deductible, as stated in your policy. We bill everything above that line directly to your carrier. No invoice surprises after the fact.
What if I don’t have coverage, or my claim is denied?
Financing is available through Wisetack: soft credit check (no hard pull), 3–24 month terms, loan amounts $500–$25,000. We walk you through the application before the project starts.
Do you charge for the inspection or the estimate?
No. The emergency inspection is free, and the written Xactimate estimate is free before any work begins. You see your number before you commit.
Will the final bill match the estimate?
Yes within scope. Our No Surprise Invoice Promise: any change-order must be written and signed before we execute it. No hourly surprises, no “while we were in there” line items.

What happens between your call and your deductible

The actual flow of a covered water-damage claim with True Day. No surprise phone calls, no mystery line items.

Hour 0

Your call

Live-answered 24/7 at (385) 247-9359. We get the address, the scope, and whether you’ve opened a claim yet. We can start the claim with you on the line if it helps.

Hour 1

Arrival + free inspection

45-minute arrival inside South Jordan city limits; 45–75 min adjacent cities. Full moisture map, photos, category assessment, written scope — all free, no commitment.

Hour 2–4

Xactimate scope + emergency mitigation

You get a written Xactimate estimate in the same format your carrier uses. We begin IICRC S500 emergency mitigation (extraction, initial drying setup) under the carrier’s mitigation authority so the loss stops getting worse.

Day 1–2

Adjuster conversation

Your carrier assigns an adjuster. We send our scope + photos + moisture readings. Many adjusters review remotely and approve the mitigation scope same-day; some schedule a site visit.

Day 3–7

Scope approval

Approved mitigation + repair scope confirmed in writing. If the carrier disputes any line, we handle the back-and-forth — you don’t translate between parties.

Day 7+

Direct billing & your deductible

We bill the carrier direct for the approved scope. Your out-of-pocket is your deductible, as stated in your policy. One invoice, one number, no surprise reconciliation.

Timeline depends on carrier responsiveness; most Cat 1 approvals land inside the first 48 hours. We update you at every handoff — no silent treatment.

Three ways to pay — all with the same scope up front

Whether your carrier covers it, denies it, or you are paying cash, the number you see on day 1 is the number you pay.

Path 1

Covered insurance claim

You pay the deductible, we bill the rest

Carrier approves the Xactimate scope. Your out-of-pocket is your deductible, as stated in your policy.

  • We file supplementals for hidden damage
  • No post-closeout reconciliation surprises
  • Scope changes = signed change-order first, carrier approval second, execution third
Path 2

Claim denied or no coverage

Wisetack financing available

Soft credit check (no hard pull on your report), 3–24 month terms, $500–$25,000 loan amount.

  • Apply before work starts, know your monthly before you commit
  • Direct ACH to Wisetack; we are paid at approval
  • Pay off early without penalty
Path 3

Out-of-pocket

Written scope first, pay on completion

Written Xactimate scope delivered before work. Same scope-first rule as insurance jobs — you see the number before any equipment is set.

  • Payment on completion with a signed final walkthrough
  • Credit card, check, or ACH
  • Signed change-orders only for scope additions mid-job

Common to all three paths: free emergency inspection, free written Xactimate estimate, No Surprise Invoice Promise (signed change-orders only), 2-year workmanship warranty / 90-day mold.

How to read your Xactimate estimate — the line items decoded

Xactimate is the industry-standard scope software every carrier reads. Here’s what the structure means when you open the PDF.

Room section

Each room is its own section with LxWxH

Line items are grouped by room, with the measured dimensions at the top. The dimensions set the quantities for area-based items (drywall sqft, flooring sqft, baseboard LF).

MIT

Mitigation line items

Everything done to stop the loss from getting worse: water extraction, equipment setup, dehumidification days, moisture monitoring. These are the first scope approved and usually billed separately.

DEM

Demolition line items

Controlled removal of unsalvageable material. Example: “Remove drywall — to 2 ft above the water line” or “Detach and reset baseboard” (meaning we save and reinstall it).

REC

Reconstruction line items

Rebuild activity: hanging new drywall, taping, mudding, texturing, priming, painting, flooring reinstall. Approved as a separate scope after mitigation is signed off.

O&P

Overhead & Profit (10% + 10%)

Industry-standard markup on labor and materials. Typically 10% overhead + 10% profit = 20% total. Carriers approve or dispute this line based on job complexity and whether sub-trades are involved.

Supplemental

Scope additions after original approval

Any hidden damage found after demolition starts (saturation we couldn’t see with FLIR, mold under vapor barrier, soft spots in subfloor). Filed as a supplemental; approved separately; your deductible doesn’t apply twice.

If your carrier’s Xactimate scope arrives different from ours, we read both line-by-line with you and handle any disagreement in writing with the adjuster. You don’t translate.

Replace vs. restore — by material + category + timing

The honest rules for what we can dry in place and what has to go. Decisions depend on the IICRC Category and how long the material was wet.

MaterialCat 1 <48hCat 2 or >48hNotes
Carpet (face)Dry in placeRemoveCat 3 — always remove.
Carpet padUsually removeRemovePad absorbs more than face; often removed even on Cat 1.
Drywall (above water line)Dry in placeDependsFlood cuts: 2 ft above water line on Cat 2/3.
Drywall (below water line)DependsRemovePaper backing wicks; often removed on anything >Cat 1.
Hardwood — sealed, engineeredDry in placeDependsSpecialty mats + desiccant on Cat 1 jobs caught early.
Hardwood — solid plank, unsealedDependsRemoveCupping after 72h is usually permanent.
Laminate / LVPDependsRemoveFloating floor + MDF core = edge swell + delamination.
Cabinets — particleboardDependsRemoveBase cabinet toe-kick is the usual failure point.
Cabinets — plywoodDry in placeDependsPlywood tolerates more; still watch toe-kicks.
Fiberglass insulationDependsRemoveDries slowly; often removed even on Cat 1 to open cavity.
Closed-cell foam insulationDry in placeDry in placeHydrophobic; cavity above/below drying unchanged.
Subfloor — OSBDry in placeDependsWatch for I-joist web delamination (see Daybreak block).
Subfloor — plywoodDry in placeDependsMore forgiving than OSB; check moisture to standard.
BaseboardDetach + resetDetach + resetWe detach to open the wall cavity for drying; reinstall after.
Door + trimDry in placeDry in placeSand + repaint if swelling marks remain.
Mattresses, upholsteryDependsRemoveCat 3 — always remove to approved waste.

“Depends” means we read the moisture content and the category at inspection, then decide. Our scope will tell you honestly which items go which way — and if you want a save we can’t justify, we’ll say why.

Water damage restoration cost — the honest breakdown

Restoration cost is one of the first questions on every call and one of the hardest to answer without the inspection. There is no flat price because the scope depends on specific IICRC S500 variables (Category, Class, dwell time, materials affected) that require measurement. But there are honest ranges based on scope type, and the dollars go to specific line items that are documented in your Xactimate scope. Here is where the money actually goes.

Cost ranges by scope type (Salt Lake Valley 2026 pricing)

Scope TypeMitigationReconstructionTotal
Small Category 1, one room, no demo$1,500 – $3,500$0 – $1,500$1,500 – $5,000
Finished basement, Class 2, flood cut$3,500 – $7,500$2,500 – $6,500$6,000 – $14,000
Ceiling-to-floor migration (Class 3)$5,500 – $10,000$5,500 – $12,000$11,000 – $22,000
Category 2 (grey water)$4,500 – $8,500$4,000 – $10,000$8,500 – $18,500
Category 3 (sewage)$7,500 – $15,000$6,500 – $15,000$14,000 – $30,000
Mold remediation (added)+$2,500 – $8,000included+$2,500 – $8,000

Where the money goes on a typical finished-basement loss

For a $10,000 Category 1 Class 2 finished-basement water loss, the typical scope allocation runs roughly:

  • Water extraction and emergency response — $350-$700. Truck-mount extraction, labor, same-night response premium if after-hours.
  • Equipment-days (dehumidifier, air movers, HEPA scrubber) — $1,500-$3,000. 3-5 days of equipment covering the drying cycle.
  • Demolition (drywall flood cut, carpet, pad removal) — $1,000-$2,000. Labor and dumpster.
  • Antimicrobial, moisture monitoring, documentation — $400-$800. Materials and daily moisture logging labor.
  • Drywall replacement + texture + prime + paint — $2,500-$4,500. Materials and labor through finish.
  • Flooring reinstall (carpet + pad) — $1,500-$3,000. Materials and labor.
  • Baseboard, trim, caulk, touch-up — $400-$800.
  • Overhead and profit (10% + 10% Xactimate standard) — about $1,500 on a $10,000 scope.

What you actually pay out of pocket

For a covered claim under a Utah homeowners policy, you pay the deductible only. Typical Utah deductibles are $1,000-$2,500 (check your dec page). The carrier pays the balance directly to us where we have direct-billing arrangements. On a $10,000 scope with a $1,500 deductible: you pay us $1,500; the carrier pays us $8,500. The total scope dollar figure never comes out of your pocket unless the loss isn’t covered.

If the loss isn’t covered (or you don’t have insurance)

If the carrier denies the claim (gradual damage, policy exclusion, lapsed coverage) or you’re uninsured, the full scope is out of pocket. For most Utah homeowners this is where financing matters:

  • Wisetack financing — our financing partner. Soft credit check, 3-24 month terms, amounts $500-$25,000. Decision in minutes; no impact on credit until acceptance.
  • Payment plans — on scopes we’re writing out of pocket, we can usually split into 2-3 payments across the project rather than requiring full upfront.
  • Written estimate first, deposit second, balance on completion — standard structure for non-insurance work. Deposit is typically 25-40% to cover materials; balance due at final walkthrough.

Water damage cost — frequently asked questions

Why can’t you give me a flat price over the phone?
Water-damage cost depends on three specific IICRC S500 variables that only an on-site inspection can measure: Category (what was in the water), Class (how much absorbent material got wet), and dwell time (how long before mitigation started). The same-sized room ranges from $2,000 to $20,000 depending on these variables. Any contractor giving a flat price without seeing the loss is either over-charging the small scopes or under-scoping the large ones.
What do I actually pay out of pocket for a covered loss?
The deductible only. Typical Utah deductibles are $1,000-$2,500 (check your dec page). We bill most Utah carriers directly for the balance. On a $10,000 scope with a $1,500 deductible: you pay us $1,500, the carrier pays us $8,500. The total scope dollar figure never comes out of your pocket unless the loss isn’t covered.
Do you charge for the initial inspection?
No. The initial inspection, moisture mapping with thermal and meter instruments, and the written scope delivered within 48 hours are all free. There is no obligation to proceed; the scope is yours to keep even if you choose another contractor.
What about if my insurance denies the claim?
If the carrier denies (gradual damage, policy exclusion, lapsed coverage), the scope is out of pocket. For most Utah homeowners this is where financing matters. Our financing partner Wisetack offers soft credit check, 3-24 month terms, $500-$25,000 amounts — decision in minutes with no impact on credit until acceptance. We can also split payments across the project rather than requiring full upfront.
What does "Xactimate pricing" mean on my scope?
Xactimate is the industry-standard pricing software that insurance adjusters use. Prices are locked by Utah ZIP code and updated quarterly by the publisher. Honest contractors using Xactimate charge the same price for the same line item in the same ZIP code — the number isn’t negotiable per contractor. Comparing two Xactimate scopes line-for-line is apples-to-apples; comparing a flat-price scope to an Xactimate scope is not.
Will the final bill match the written estimate?
The written scope you sign at project start is the base invoice. If hidden damage emerges during demolition, we document it, send a supplement to your carrier for approval, and get your written sign-off before billing any addition. No supplement happens verbally. If something comes up and we don’t do the above sequence, you can refuse the addition — that’s what written scope-change discipline means.

Written estimate. No bait-and-switch. No surprise invoice.

The number we put in writing before any crew touches your home is the number you work from. Here is exactly how we hold that promise.

  1. Scope and cost are documented in writing on day one, after the on-site assessment, before anything is torn out or dried.
  2. Any mid-job scope change — a hidden leak, a wall cavity we need to open, a material swap — stops the clock. Nothing proceeds on that portion until you sign off, in writing, on the supplement.
  3. If your insurer is involved, every supplement goes to your adjuster at the same time it goes to you. Nobody is working off a copy you haven’t seen.
  4. The final invoice matches the approved scope plus any approved supplements. Line items we didn’t quote don’t appear on the bill.

If you ever see a charge on a True Day invoice that isn’t tied to a scope line you approved, call (385) 247-9359 and ask Michael directly — we take it off.

Our zero-upsell policy

Water-damage emergencies are the single most common venue for upsell abuse in the trades — a stressed homeowner, an exposed wall cavity, and a convenient ‘while we’re already here’ pitch. We don’t work that way. Here is what we commit to in writing.

  • No service that wasn’t in the written scope is ever added mid-job without a separate signed supplement — not a recommendation, not a verbal upgrade, not a conversation with a technician.
  • No commission-driven add-ons. Our technicians are W-2 employees on salary and hourly pay. They do not earn commission on scope increases, so there is no financial incentive on-site to grow the invoice.
  • No “while we’re already here” sales. Discovering a separate issue (an aging water heater, outdated plumbing, a crawl-space concern unrelated to the current loss) means we document it, show you the photo, and give you the referral — not an on-site sales pitch.
  • No scope-creep hiding inside the insurance line items. Every supplement goes to the adjuster and to you in writing, in Xactimate format, before work on that supplement begins.
  • No pressure to decide now. If you want a second opinion on scope from another IICRC firm or your adjuster, we wait — mitigation to prevent further damage continues; everything else pauses until you’ve reviewed.

What this means in practice: if the invoice at close-out contains any line item you did not knowingly approve, call Michael directly at (385) 247-9359 and we remove it. This isn’t a courtesy, it’s the policy — it’s why we wrote it down.

Should you file an insurance claim, or pay out of pocket?

Not every covered water loss is worth filing on your homeowners policy. The math is deductible, estimated repair, and your claim history. Here’s how we help you think it through — before we send anything to your carrier.

File the claim

If the estimated repair cost is well above your deductible — typically more than double — and you haven’t filed a claim in the last three to five years, filing is usually the right call. Water-damage losses tend to escalate scope once walls are opened, so what looks like a small claim on day one often grows.

Think carefully

If the estimated repair is only slightly above your deductible, and especially if you’ve filed one or more claims in recent years, the renewal exposure may make the net math worse than paying out of pocket. Some carriers surcharge or non-renew after two water-damage claims in a short window.

Probably pay out of pocket

If the estimated repair is at or below your deductible, filing adds a claim to your record for no financial benefit. In that case, we document the loss for your records (in case scope grows later) and bill you directly.

How we handle this on our endWe give you an on-site estimate before any decision has to be made. You can file, you can not file, you can file later if scope grows — we work either way, and we document the loss identically so you don’t lose your options. Call (385) 247-9359 to walk through the math with us before you file.

What drives the number — the unit mechanics behind every estimate

We don’t publish fixed quotes because every loss is sized differently. We do publish the mechanics each line item is priced on — the same ones every major carrier’s Xactimate pricing uses — so you can see what moves the number up or down before we show up.

Line itemWhat drives the number
Water extractionDay 1 emergencyPriced per hour of crew labor plus truck-mount or portable extractor time. Driven by water volume, access distance to the extraction point, and whether the water is Category 1, 2 or 3 (Category 3 requires PPE and bio-contained disposal).
Structural dryingEquipment-daysPriced per equipment-day: one air mover for one day, one dehumidifier for one day. Daily moisture logs document each day. Typical IICRC Class 2 residential dry is 3–5 days; Class 3 or 4 can run 5–10 days. Fewer days + fewer machines = lower number only if drying actually completes.
Antimicrobial applicationPer square footPriced per treated square foot of affected material. Required on Category 2 and 3 water losses per IICRC S500. We use thymol and accelerated hydrogen peroxide — both EPA-registered.
Content manipulationPer hour or per roomPriced for moving contents out of the drying zone and back. Driven by volume of affected contents, access, and whether anything requires pack-out for off-site cleaning and storage.
Demolition and removalPer linear/square footPriced per linear foot of affected baseboard, per square foot of flooring and drywall. Category 3 water or Class 4 drying usually requires removal of affected porous materials; Category 1 at Class 2 often allows dry-in-place.
ReconstructionSeparate scopePriced per Xactimate line item at zip-code-adjusted rates. Usually a separate scope approval after mitigation drying completes, because exposed cavities often reveal scope that wasn’t visible on day one.

Why ranges, not fixed numbers

A “$3 per square foot” or “$5,000 average” number anywhere on the web is marketing math. Real pricing is equipment-days + line items + category multiplier, written in Xactimate, matched to your scope. We publish a free written estimate before any work starts, and no number on this page is a promise — the written estimate is.

If the out-of-pocket is a problem. We partner with Wisetack financing — soft credit check, 3- to 24-month terms, $500–$25,000 amounts. Available before you decide whether to file the claim, so cost isn’t what forces the decision.

6 things you can do to reduce the final bill

Beyond the IICRC S500 scope decisions, there are specific homeowner actions that affect final cost. None of them involve cutting corners — they’re things we’d tell you anyway.

  1. Call fast. The single biggest cost driver is time. Cat 1 water at hour 2 is a small scope. Same water at hour 50 is Cat 2 with more removal. Hour 72+ is Cat 3 with full porous-material discard. The 10-minute decision whether to call changes thousands of dollars of scope.
  2. Shut the source yourself before we arrive. If you can safely shut the main valve or specific fixture valve, every minute saved stops migration from expanding the affected footprint.
  3. Move contents off the floor — especially porous items (books, upholstered furniture, rugs). Items we don’t have to clean + dry are items we don’t have to bill for cleaning + drying.
  4. Verify your insurance coverage BEFORE scope decisions. If sewage backup isn’t covered under your policy and you don’t have the rider, that scope is your out-of-pocket. Knowing before work starts lets you decide a reduced scope that fits your budget.
  5. Choose standard replacement materials rather than upgrades on reconstruction. Insurance pays like-kind, like-quality. Choosing a $12/sf tile when your original was $4/sf laminate means you’re paying the $8/sf difference out of pocket. Standard replacement = covered; upgrade = you fund the delta.
  6. Decline unnecessary “testing” add-ons. If you can see visible mold, lab testing changes nothing about remediation scope. Don’t pay for tests that don’t change the decision.

What NOT to do, even to save money

  • Don’t rent your own equipment and attempt DIY on a Cat 2 or Cat 3 loss
  • Don’t accept “dry it in place” on OSB subfloor that sat wet past 24 hours
  • Don’t skip the moisture-mapping step — it finds hidden migration that would cost more later as mold
  • Don’t paint over damp drywall because you’re tired of the project
Working within a tight budget?Call (385) 247-9359. We’ll scope the minimum necessary to prevent further loss + walk you through what you can defer vs. what’s urgent.

What the carrier pays vs. what you pay

On a covered loss with direct billing authorized, here is the typical split by cost category.

Covered losses — typical cost split

Cost categoryCarrier paysYou pay
Emergency mitigation (extraction, dry-out, antimicrobial)Full line itemsNothing (goes toward deductible)
Documentation + inspectionFull (bundled in mitigation line items)Nothing
Reconstruction — like-kind (same material + grade as original)Full approved scopeNothing beyond deductible
Reconstruction — upgrades (nicer material, higher grade)Equivalent of like-kindUpgrade delta
DeductibleNothingFull deductible amount (on your policy declarations)
Depreciation (if ACV policy)Depreciated value onlyDepreciation amount if ACV; nothing extra if RCV
Items above sublimits (mold, personal property)Up to sublimitAnything above the sublimit
Items that exceed category coverageWithin policy limitsAny amount beyond policy limits
Specialty items (artwork conservation, electronics restoration)Line items if included in policyDeductible applies; some policies sublimit specialty cleaning
Content replacement (clothes, furniture, personal property)Up to personal property limit (often 50-70% of dwelling limit)Anything above personal property limit

What’s NOT covered that homeowners sometimes expect

  • Code upgrades (new electrical, insulation, plumbing standards required at reconstruction) unless you have ordinance and law coverage
  • Preventive measures for future losses (foundation waterproofing, sump pump upgrades) — these are improvement, not restoration
  • Supply-line replacement on the pipe that failed — plumber’s invoice is separate
  • Items beyond policy limits — e.g., high-value art, jewelry, firearms without specific endorsements
  • Alternative Living Expense (ALE) — separate coverage, has its own limit + sublimit

The hidden cost most homeowners miss

If the loss is Cat 1 at hour 2 and Cat 3 at hour 50 because mitigation was delayed, the additional scope between those two states is often where disputes arise. Carriers may push back on the delta if the delay was homeowner-side. Fast response is literal cost containment.

Want a scope split against YOUR specific policy?Call (385) 247-9359. We can walk through what your declarations page covers before you authorize work.

What drives mold remediation cost (vs water-only cost)

Water-only cost is driven mostly by extraction + drying + materials + labor. Mold remediation adds categories that aren’t on a water-only invoice. Here are the specific cost drivers on a mold job that explain why mold costs more than water-only even for similar square footage:

Containment setup. Physical poly containment with sealed entry, HEPA negative-air machine, decontamination chamber for larger jobs. Materials cost + install time that doesn’t appear on water-only scope.
PPE and labor rate. Full PPE (Tyvek, respirators, gloves) is a per-job consumable cost. Labor rate for AMRT-certified technicians performing mold work is higher than general restoration labor.
Longer dwell times. HEPA scrubbers running continuously for 24-48 hours of dwell after physical work is complete. Equipment hours accumulate differently than on water drying.
Specialty removal method. Mold removal involves pre-removal HEPA vacuum, cutting with containment in place, double-bagging in containment, decon-chamber pass-out. Takes more time per square foot than standard demolition.
Antimicrobial materials. EPA-registered mold-specific antimicrobials are more expensive than general-purpose cleaners. Also encapsulant sealers for post-cleaning framing.
Post-remediation verification (PRV). Lab fees for air and surface sampling. IEP engagement for independent verification on larger jobs. Fees passed through at cost.
Disposal protocol. Waste requires appropriate transport (not consumer garbage service), landfill disposal. Added disposal line item.
Project management overhead. Mold jobs typically require more coordination — scheduling, inspection waits, PRV turnaround, insurance back-and-forth. Project management time adds to scope.
What doesn’t drive mold cost. Fear-based pricing. If a firm’s mold job pricing is twice their water job pricing for the same affected area, ask what’s in the extra cost. The categories above should account for the delta; anything beyond is either specific to your scope or fat in the invoice.

Our scope presents these line items explicitly. You see what each category costs so the comparison between a water-only quote and a mold quote is a comparison of specific line items, not a mystery.