Published September 29, 2026 · Authored by Michael Bass, Owner, True Day Water Damage Restoration · Utah Contractor License #960332-3505 · IICRC Certified Firm #927354-5258
Before You Start: The 3 Rules
Rule 1: Document everything, from the first minute. Photos and video from before the water is removed matter more than photos taken afterwards. If you have 30 seconds while water is still visible, take pictures.
Rule 2: Do not remove or throw away anything until the adjuster or a restoration contractor says so. Damaged materials are evidence for the claim. Removed materials are just trash.
Rule 3: Your policy has a “duty to mitigate” clause. Do not delay drying while waiting for the carrier. Call a restoration contractor immediately — the claim opens in parallel.
The 10 Steps
Step 1 — Stop the Water (First 5 Minutes)
Before you do anything else, stop the source. This means:
- Shut off the main water supply valve if the failure is on the supply side (burst pipe, supply line, water heater)
- Turn off any specific appliance shutoff (washing machine, dishwasher, ice maker) if that’s the source
- For roof leaks, contain the water with tarps and buckets — you cannot stop the source until the storm ends
- For sewer backups, stop using all drains and toilets until a plumber clears the line
Stopping the source is the #1 mitigation step your policy requires. Every additional minute of active water is additional damage.
Step 2 — Photograph and Video Everything (Minutes 5–20)
Before you touch anything, walk through the affected areas with your phone and take:
- Wide-angle photos of every room showing the extent of water
- Close-up photos of damaged materials (drywall, flooring, cabinets)
- Photos of every damaged personal item, showing the damage clearly
- Close-up photos of the source of the water (the failed pipe, the ruptured water heater, the ceiling leak)
- Video panning across the affected area with narration (“this is the master bedroom, water came in from the ceiling here”)
- Photos of any receipts or documentation you have for high-value items in the damaged area
If you have time for only one action after stopping the water and before anyone else arrives, it is this one. Photos taken after removal are worth a fraction of photos taken during the event.
Step 3 — Call a Restoration Contractor (Minutes 20–30)
Restoration contractors are dispatched separately from your insurance claim. You call them directly. They arrive with extraction equipment, moisture meters, and drying equipment, and they begin mitigation immediately.
Do not call your insurance company first. Two reasons:
- Your carrier’s phone tree is designed to slow you down. It routes you through a call center, then a claims department, then eventually an adjuster who won’t call back until the next business day.
- Your policy’s “duty to mitigate” clock is running. Waiting for the carrier before drying starts can result in denied coverage for mold or spread damage.
Call the restoration contractor directly. In our service area, that number is (385) 247-9359. Real person answers 24/7. Arrival within 45 minutes.
Step 4 — Call Your Insurance Company (Minutes 30–60)
Once the restoration contractor is dispatched, call your carrier to open the claim. Have this information ready:
- Your policy number
- Your address
- The date and approximate time the event happened
- The cause of the damage (burst pipe, failed water heater, storm, sewer backup, etc.)
- Whether anyone is injured
- Whether the home is habitable
- Your best estimate of the extent of damage (rooms affected, whether flooring/drywall are wet)
The carrier will give you a claim number. Write it down. Every future communication about this event references that number. Once the claim is open, the carrier assigns an adjuster.
Step 5 — Meet With the Adjuster (Days 1–5)
The adjuster contacts you (usually within 24–48 hours) to schedule an inspection. Rules for the adjuster inspection:
- Do NOT throw anything away before the inspection. Damaged materials on-site are evidence the adjuster uses to determine coverage.
- Show them everything. Walk them through every affected area, point out damage they might miss, hand them your photos from Step 2.
- Have your restoration contractor present. If True Day is your contractor, we attend the adjuster meeting on your behalf and translate technical damage into Xactimate scope language.
- Take notes. Write down every question the adjuster asks and every answer you give.
- Ask for their business card. You will need to reach them again.
The adjuster’s job is to determine what your policy covers and at what value. They are not your enemy, but they also do not work for you. They work for the carrier.
Step 6 — Review the Adjuster’s Scope (Days 3–10)
Within a few days of the inspection, the adjuster produces an Xactimate scope — a detailed line-item list of what the carrier will pay for. This scope becomes the basis for your project.
Read it carefully. Look for:
- Every room and area that was damaged — is it included?
- Every damaged material (drywall, flooring, cabinets, insulation) — is it included?
- Drying equipment (dehumidifiers, air movers) — is the number and duration reasonable?
- Contents (belongings, furniture) — is the coverage listed correctly?
- Living expenses (hotel, rental, meals) — is Loss of Use coverage triggered?
If anything is missing or under-scoped, your restoration contractor files a supplement with the carrier to add it. Do not accept the initial scope as final unless it truly covers everything.
Step 7 — Sign the Work Authorization
Once the scope is agreed, you sign a Work Authorization with the restoration contractor. This is the document that formally engages the contractor and defines the terms. Read every clause.
Things a good Work Authorization includes:
- The specific scope of work being authorized
- The hourly labor rate and daily equipment rate
- The 24-hour cooling-off period (your right to cancel within 24 hours)
- The dispute-resolution process
- The insurance-billing structure (usually direct billing to the carrier)
- Your deductible amount
See our Cancellation Policy for the specifics of what True Day’s Work Authorization includes.
Step 8 — Restoration Work Begins
Once the Work Authorization is signed, the restoration contractor begins the work. For water damage, this typically means:
- Day 1: Extraction of standing water, initial demolition of non-salvageable materials, placement of drying equipment (dehumidifiers, air movers), containment setup
- Days 2–5: Continuous drying, daily moisture monitoring, adjustment of equipment placement, documentation of drying progress
- Days 5–7: Dry standard verification (materials at species-specific dry percentages), removal of drying equipment
- Days 7–14: If reconstruction is needed (drywall, flooring, cabinet replacement), this phase begins after drying is complete and materials arrive
- Final walk-through: Contractor walks you through completed work, you sign completion documentation
Timeline varies by scope. A small burst pipe in one room may complete in 5 days total. A Category 3 sewage event affecting a full basement may take 3–6 weeks.
Step 9 — Payment and Deductible
Your carrier pays the contractor directly for the covered portion of the project, minus your deductible. Your out-of-pocket cost is:
- Your deductible (typically $1,000–$2,500)
- Any items excluded from coverage (usually pre-existing damage, upgraded materials beyond code, or non-covered scope items)
Payment terms are typically:
- Deductible due to the contractor within 30 days of project completion
- Carrier payments are issued as work milestones are reached (some carriers pay a portion at start, portion at midpoint, portion at completion)
Wisetack financing is available for the deductible if needed — see our Financing page.
Step 10 — Final Documentation and Warranty
After the project is complete, ensure you have:
- Written completion documentation from the contractor
- Final invoice showing all payments received and applied
- Written workmanship warranty (see True Day’s Written Warranty)
- Moisture readings at completion documenting the home is fully dry
- Photos of completed work
- All Xactimate scope documents and supplements filed with the carrier
- Your claim number and the adjuster’s contact info (in case latent issues arise months later)
Keep this file forever. If a mold or structural issue surfaces 6 months later, this file is what your warranty claim, supplemental insurance claim, or future home sale disclosure will rely on.
Downloadable Photo and Inventory Checklist
Print this before an event happens, or reference it during one. It’s the same checklist we walk homeowners through when we arrive on-site.
Photo Checklist (In Order of Priority)
Before you touch anything:
- ☐ Wide-angle photo of each affected room from every entryway
- ☐ Wide-angle photo showing where the water came from (source point)
- ☐ Close-up of the source failure (ruptured pipe, cracked water heater, ceiling stain)
- ☐ Photos of standing water depth against a wall or fixed reference point
- ☐ Photos of damaged flooring (carpet, hardwood, tile, LVP) with cause visible
- ☐ Photos of damaged drywall (staining, sagging, separation, bubbling)
- ☐ Photos of damaged cabinets, furniture, or built-ins
- ☐ Photos of any personal items visibly damaged (electronics, books, clothing)
- ☐ Video: 30-second walk-through with narration of what happened and where
During adjuster meeting:
- ☐ Photos of adjuster’s markings on walls/floors (indicating what will be replaced)
- ☐ Photos of moisture meter readings taken by the contractor or adjuster
- ☐ Photos of any thermal imaging results
- ☐ Written notes on what the adjuster verbally agreed to include in scope
During restoration:
- ☐ Photos of demolition (walls opened, flooring removed) showing the extent of hidden damage
- ☐ Photos of equipment placement (dehumidifiers, air movers)
- ☐ Daily photos of drying progress
- ☐ Photos of any additional damage discovered mid-project (basis for supplement filing)
Contents inventory list (fill in during first 24 hours):
- ☐ Room: ________________________
- ☐ Damaged items (item, approximate purchase date, approximate value):
- ☐ ______________________________________
- ☐ ______________________________________
- ☐ ______________________________________
- ☐ ______________________________________
Documentation to gather:
- ☐ Homeowners insurance policy (full copy, not just summary)
- ☐ Recent receipts for high-value items in damaged area
- ☐ Home inventory (if one existed before the event)
- ☐ Prior repair receipts for the affected area (proves things were in working order)
- ☐ Photos of pre-existing condition of the room (if you have them from before)
To request a printable PDF version of this checklist, email [email protected] with “Claim Checklist” in the subject line. We send a formatted PDF within 24 hours at no charge.
Common Mistakes That Delay or Reduce Claims
- Waiting to call anyone. Every hour of delay is documented damage that could have been prevented.
- Throwing away damaged items before the adjuster inspects. Once it’s in the trash, it’s not on the claim.
- Cleaning up before photographing. Photos of a clean floor after extraction don’t show the adjuster what happened.
- Signing the first scope without review. Initial scopes are usually under-scoped. Have your contractor review.
- Accepting the carrier’s “preferred vendor” without vetting. Preferred vendors work for the carrier’s cost containment goals. You have the right to choose your own contractor.
- Paying the contractor before the carrier pays. Insurance-billed projects should have the carrier pay the contractor directly, minus your deductible.
- Not filing a supplement when new damage is discovered. Damage found during demolition (mold, hidden rot) requires a supplemental claim filing to be covered.
- Not documenting the completion for future reference. Latent issues months or years later depend on the completion file.
Timeline Expectations
| Phase | Typical Duration |
|---|---|
| Emergency response + first-day mitigation | Day 1 |
| Adjuster contact + scheduling | Days 1–3 |
| Adjuster inspection | Days 3–7 |
| Xactimate scope + approval | Days 5–14 |
| Structural drying | 3–7 days |
| Reconstruction (if needed) | 2–8 weeks |
| Final settlement + payment | 30–60 days after completion |
Total elapsed time from event to final payment: typically 45–90 days for a straightforward water event, 3–6 months for a Category 3 or major-loss project.
When to Escalate to a Public Adjuster or Attorney
Most Utah claims proceed without incident. However, if you’re facing:
- A denial you believe is incorrect
- An initial scope that’s significantly under-valued
- Repeated delays or lack of communication from the carrier
- A claim value over $25,000 with a dispute
- Any indication of bad-faith handling
Consider consulting:
- A licensed Utah public adjuster — represents you against the carrier for a fee (10–15% of the claim)
- A property insurance attorney — for high-value or contentious claims
- The Utah Insurance Department — file a complaint at insurance.utah.gov
Related Reading
- Does Homeowners Insurance Cover Water Damage in Utah?
- Water Damage Restoration Services
- Written Limited Workmanship Warranty
- Cancellation, Rescheduling & Stop-Work Policy
- Financing Terms
- Free Inspection Policy
- Verified Facts About True Day
Guide version 1.0 — Published September 29, 2026 · Next scheduled review: October 2026
Utah water-damage claim: the actual 10 steps
Insurance claims live and die on documentation and sequence. Do them in this order and the claim moves. Skip a step and the adjuster will come back for it.
- Stop the water source. Shut off the main valve or isolate the fixture. Photograph the source before you move anything.
- Document everything on your phone. Wide shots and close-ups of standing water, affected contents, visible structure damage. Time-stamped. Before you start cleanup.
- Call your insurer to file the First Notice of Loss (FNOL). You’ll get a claim number and an adjuster assignment. Keep both handy.
- Mitigate immediately. Your policy requires you to prevent further damage — call a licensed restoration contractor the same day. Delay here is where carriers deny for failure to mitigate. We dispatch 24/7/365 at (385) 247-9359.
- Let the restoration contractor scope the mitigation. IICRC S500 category/class call, moisture map, equipment plan, dry-out timeline — all documented for the adjuster.
- Adjuster inspection. The adjuster visits (in-person or virtual) and writes a scope using Xactimate line-item pricing. Make sure the restoration contractor is present or has already sent them the mitigation documentation.
- Carrier approves scope + pricing. Mitigation line items usually approve quickly. Reconstruction can take longer, especially for higher-value losses.
- Work proceeds under approved scope. If anything is found during work that wasn’t in the original scope (hidden mold, additional migration), the contractor files a supplement with photos and new readings.
- Final walk-through + close-out documentation. Final moisture readings, before/after photos, certificate of completion. Carrier releases final payment.
- Warranty issued. Written workmanship warranty for the restoration work. Ours is 2-year transferable + 90-day mold.
